Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Jan 2025 |
| Application filed | 25 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | gawar-singh (J.V.) |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Laichurui |
| Taluk / tehsil | Donka |
| District | Karbi Anglong |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00721 |
In context
97 applications in Karbi Anglong since January 2022 are in the same category (Mining): 61 approved, 13 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.2 acres, this one is smaller than 60% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Laichurui, Donka, Karbi Anglong, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upper Dillai NC P.P. Land Stone Mining Permit Area — initial checks, 500 m away
- Upper Dillai NC P.P. Land Stone Mining Permit Area — withdrawn, 500 m away
- P.P. Land Stone Mining Permit Area, Saijang — lapsed, 800 m away
- Koilajan Coal Mine — under environmental review, 8.1 km away
- Koilajan Coal Mine — cleared for impact study, 8.1 km away
- Sainik School Project located at Langvoku, Karbi Anglong, Assam by GOVERNMENT… — environmental approval granted, 11.2 km away
- Radiant Industrial Park & Logistic Centre (RIPLC) (A Project of Radiant… — environmental approval granted, 16.9 km away
- Dhansiri River Ordinary Clay/Silt Mahal No.2 — lapsed, 18.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.