Quick answers
What is this project?
"M/S BD Brick Field Mining Permit Area, Deori Habi Gaon, Demow" is a lapsed mining project in Dirai Habi, Dimow, Sivasagar, Assam. The site covers 0.8 acres.
Who is building it?
The applicant is Bokul Dowari.
Has it been approved?
No. The application was lapsed on 6 Feb 2025, so it is no longer under consideration.
Where is it?
In Dirai Habi, Dimow, Sivasagar, Assam.
How big is it?
It has a stated cost of ₹9 lakh and a site of 0.8 acres.
When was it filed?
The application was filed on 23 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Feb 2025 |
| Application filed | 23 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bokul Dowari |
| Land area | 3,400 m² |
| Project cost | ₹9 lakh |
| Village / locality | Dirai Habi |
| Taluk / tehsil | Dimow |
| District | Sivasagar |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00923 |
In context
74 applications in Sivasagar since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.8 acres, this one is smaller than 70% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Dirai Habi, Dimow, Sivasagar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S H Brick Field Mining Permit Area — more information requested, 2.4 km away
- "Kathalbari Gaon Brick Earth Mining Permit Area, (M/S IBF Brick Field)" — lapsed, 3.4 km away
- M/s M.R. Brick Field Mining Permit Area — lapsed, 3.7 km away
- "m/S Sun Brick Field Earth Mining Permit Aera" — more information requested, 3.7 km away
- Medical College (100 Admissions) & Hospital — environmental approval granted, 8 km away
- Medical College (100 Admissions) & 510 Bedded Hospital, Sivasagar, Assam — withdrawn, 8 km away
- Waste management project by M/s. Kaziranga Biotech Pvt. Ltd. — environmental approval granted, 8.1 km away
- Waste management project by M/s. Kaziranga Biotech Pvt. Ltd. — under environmental review, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.