Quick answers
What is Dalimbari Village Pp Land Stone Mining Permit Area?
Dalimbari Village Pp Land Stone Mining Permit Area is an approved mining project in Sardangang, Donka, West Karbi Anglong, Assam. The site covers 1.2 acres.
Who is building it?
The applicant is Bidya Teron.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Oct 2024), as of 27 Nov 2026.
Where is it?
In Sardangang, Donka, West Karbi Anglong, Assam.
How big is it?
It has a stated cost of ₹30 lakh and a site of 1.2 acres.
When was it filed?
The application was filed on 17 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Oct 2024 |
| Application filed | 17 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bidya Teron |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Sardangang |
| Taluk / tehsil | Donka |
| District | West Karbi Anglong |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00932 |
In context
29 applications in West Karbi Anglong since January 2022 are in the same category (Mining): 10 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.2 acres, this one is smaller than 93% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Sardangang, Donka, West Karbi Anglong, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amtreng Borpani River Sand Contract Permit Area — lapsed, 16.8 km away
- Assam/PSP-05 — cleared for impact study, 17.3 km away
- Assam/PSP-05 — under forest review, 17.3 km away
- Lengri Village Pp Land Quartzite Block Mining Permit Area — lapsed, 17.4 km away
- Chuacha Ghat Sand Contract Permit Area — lapsed, 18.5 km away
- Dan Abi (Rongagorah) Borpani River Sand Contract Permit Area — environmental approval granted, 19.9 km away
- Hongkram (Adarsha) Borpani River Sand Contract Permit Area — environmental approval granted, 20.6 km away
- Boulagog P.P. Land Stone Mining Permit Area — environmental approval granted, 20.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.