What is Developing? Open the mapMap

Environmental approval grantedIndustry · Kamrup, Assam

Grain Based Distillery (60 KLPD) and Captive Power Plant (2 MW) at Choygaon Industrial Growth Centre, Village 2 No. Jambari, Tehsil Choygaon, District Kamrup, Assam by M/s Brahmaputra Biochem Pvt. Ltd.

Grain Based Distillery (60 KLPD) and Captive Power Plant (2 MW) at Choygaon Industrial Growth Centre, Village 2 No. Jambari, Tehsil Choygaon, District Kamrup, Assam by M/s Brahmaputra Biochem Pvt. Ltd is an approved industrial project in Jambari No.2, Chhaygaon, Kamrup, Assam. The site covers 9.9 acres. Its stated project cost is ₹83.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Apr 2025).

See it on the live map All projects in Kamrup

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Grain Based Distillery (60 KLPD) and Captive Power Plant (2 MW) at Choygaon Industrial Growth Centre, Village 2 No. Jambari, Tehsil Choygaon, District Kamrup, Assam by M/s Brahmaputra Biochem Pvt. Ltd is an approved industrial project in Jambari No.2, Chhaygaon, Kamrup, Assam. The site covers 9.9 acres.

Who is building it?

The applicant is Brahmaputra Biochem Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Apr 2025), as of 27 Nov 2026.

Where is it?

In Jambari No.2, Chhaygaon, Kamrup, Assam.

How big is it?

It has a stated cost of ₹83.4 crore and a site of 9.9 acres.

When was it filed?

The application was filed on 17 Jan 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Grain Based Distillery (60 KLPD) and Captive Power Plant (2 MW) at Choygaon Industrial…

Project details

StatusEnvironmental approval granted
Status since1 Apr 2025
Application filed17 Jan 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantBrahmaputra Biochem Private Limited
Land area9.9 acres (4 ha)
Project cost₹83.4 crore
Village / localityJambari No.2
Taluk / tehsilChhaygaon
DistrictKamrup
StateAssam
Location fromSite boundary on record
Our referenceWID-AS-00954

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 29 Apr 2025Environmental approval granted9.9 acres₹83.4 crore
Amendment filed 17 Jan 2025 (this page)Environmental approval granted9.9 acres₹83.4 crore

In context

17 applications in Kamrup since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 88% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jambari No.2, Chhaygaon, Kamrup, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Brahmaputra Biochem Private Limited in Kamrup

All 4 Brahmaputra Biochem projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.