Quick answers
What is M/S A.D.K. Brick Field Mining Permit Area?
M/S A.D.K. Brick Field Mining Permit Area is a lapsed mining project in Garukhundagaon, Dibrugarh East, Dibrugarh, Assam. The site covers 0.7 acres.
Who is building it?
The applicant is Prantu Gogoi.
Has it been approved?
No. The application was lapsed on 30 Sept 2025, so it is no longer under consideration.
Where is it?
In Garukhundagaon, Dibrugarh East, Dibrugarh, Assam.
How big is it?
It has a stated cost of ₹10 lakh and a site of 0.7 acres.
When was it filed?
The application was filed on 1 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Sept 2025 |
| Application filed | 1 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prantu Gogoi |
| Land area | 2,700 m² |
| Project cost | ₹10 lakh |
| Village / locality | Garukhundagaon |
| Taluk / tehsil | Dibrugarh East |
| District | Dibrugarh |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01137 |
In context
73 applications in Dibrugarh since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.7 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Garukhundagaon, Dibrugarh East, Dibrugarh, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Ab Brick Field Mining Permit Area — lapsed, 950 m away
- M/S Rk Brick Field Mining Permit Area — lapsed, 3.4 km away
- Onshore Oil & Gas development drilling and production in Tengakhat ,Kathaloni,… — under environmental review, 6 km away
- DBR/30/Buridehing/Horeghat Bharalibari/Sand MCA — environmental approval granted, 7.1 km away
- Buridehing River Ordinary Clay/Silt Mining Permit Area (Horeghat) — environmental approval granted, 8.8 km away
- Regularisation of Existing Manufacturing Unit Vision Metalik Company of… — lapsed, 9.6 km away
- DBR/32/Buridehing/Khamti Ghat/Sand MCA — environmental approval granted, 10.8 km away
- Diversion of Forest Land for Construction of Mobile Tower at Majbam Gaon — more information requested, 11.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.