Quick answers
What is this project?
"Charaichungi Gaon Brick Earth Mining Permit Area (M/S D.B. Brick Field)" is a lapsed mining project in Charaichungigaon, Chabua, Dibrugarh, Assam. The site covers 1.9 acres.
Who is building it?
The applicant is Jibon Borah.
Has it been approved?
No. The application was lapsed on 16 Apr 2026, so it is no longer under consideration.
Where is it?
In Charaichungigaon, Chabua, Dibrugarh, Assam.
How big is it?
It has a stated cost of ₹15 lakh and a site of 1.9 acres.
When was it filed?
The application was filed on 10 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 10 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jibon Borah |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Charaichungigaon |
| Taluk / tehsil | Chabua |
| District | Dibrugarh |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01259 |
In context
73 applications in Dibrugarh since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.9 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Charaichungigaon, Chabua, Dibrugarh, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S R.B.R. Brick Field Mining Permit Area — lapsed, 3.4 km away
- M/S Dutta Brothers Brick Field Mining Permit Area — lapsed, 4.5 km away
- M/S Ns Brick Field Mining Permit Area — lapsed, 4.6 km away
- M/S Barkha Brick Field Mining Permit Area — lapsed, 5.9 km away
- M/S Vip Brick Field Mining Permit Area — lapsed, 7.4 km away
- Onshore Oil & Gas development drilling and production in Tengakhat ,Kathaloni,… — under environmental review, 7.4 km away
- Dbr/18/Buridihing/Bhekulajan Sand Mca — environmental approval granted, 7.6 km away
- M/S Rai Brick Field Mining Permit Area — lapsed, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.