Quick answers
What is this project?
No Increase Pollution Load (NIPL) 50% increase from EC Capacity 250 KLPD to 375 KLPD, Grain based Ethanol Distillery capacity 250 KLD is a proposed industrial project in Mornai, Matia, Goalpara, Assam. The site covers 17.9 acres.
Who is building it?
The applicant is Gulshan Polyols Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mornai, Matia, Goalpara, Assam.
How big is it?
It has a stated cost of ₹210 crore and a site of 17.9 acres.
When was it filed?
The application was filed on 20 Sept 2026.
Project details
| Official title | No Increase Pollution Load (NIPL) 50% increase from EC Capacity 250 KLPD to 375 KLPD, Grain based Ethanol Distillery capacity 250 KLD along with 7.0 MW at No. 02, Plot – B, Industrial Growth Centre, Matia Tehsil: Matia, District: Goalpara, Assam of M/s Gulshan Polyols Limited. |
|---|---|
| Status | Initial checks |
| Status since | 20 Sept 2026 |
| Application filed | 20 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Gulshan Polyols Limited |
| Land area | 17.9 acres (7.3 ha) |
| Project cost | ₹210 crore |
| Village / locality | Mornai |
| Taluk / tehsil | Matia |
| District | Goalpara |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01490 |
In context
5 applications in Goalpara since January 2022 are in the same category (Industry): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mornai, Matia, Goalpara, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Obtaining No Increase in Pollution Load Certificate for… — initial checks, 1.3 km away
- Application for Obtaining No Increase in Pollution Load Certificate for… — initial checks, 1.3 km away
- Aadhar Innovations LLP 199 KLD Ethanol/ ENA Distillery with 5 MW Co-Generation… — under environmental review, 1.4 km away
- Aadhar Innovations LLP 199 KLD Ethanol/ ENA Distillery with 5 MW Co-Generation… — environmental approval granted, 1.5 km away
- Aadhar Innovations LLP 199 KLD Ethanol/ ENA Distillery with 5 MW Co-Generation… — environmental approval granted, 1.5 km away
- 350 TPD Pulp Manufacturing Unit & 16 MW Co-Generation Power Plant — lapsed, 1.5 km away
- Dakaidal Village Patta Land Ordinary Earth Mining Permit Area — environmental approval granted, 2 km away
- Domoni River Govt. Sand Permit Area No.3 — environmental approval granted, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.