Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 23 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | One to Ten Solutions Private Limited |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Baghjap |
| Taluk / tehsil | Mayong |
| District | Morigaon |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01527 |
In context
32 applications in Morigaon since January 2022 are in the same category (Mining): 18 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is smaller than 94% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 22.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Baghjap, Mayong, Morigaon, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nakhula Beat Sand Permit Area No. 3 — environmental approval granted, 250 m away
- Nakhula Beat Sand Poermit Area No. 3 — environmental approval granted, 300 m away
- Bhakatgaon Sand MCA Permit Area Part-II (Rev. Portion) — lapsed, 2.6 km away
- Bhakatgaon Sand MCA Permit Area Part-II (Rev. Portion) — environmental approval granted, 4.1 km away
- Borkuloi-Boha Sand Mahal Part-I (Rev. Portion) on Kopili River Bed — environmental approval granted, 4.5 km away
- Semiconductor Assembly and Test Facility — environmental approval granted, 6 km away
- Hatiamukh Sand MCA Permit Area Part-I (Rev. Portion) — lapsed, 6.2 km away
- Semiconductor Assembly and Test Facility — cleared for impact study, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.