Quick answers
What is this project?
Robibra Block-Ii Boulder and Gravel Mining Permit Area on Diyung River Bed is a proposed mining project in Maibong, Mahur, Dima Hasao, Assam. The site covers 10.7 acres.
Who is building it?
The applicant is Amun Daulagupu.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Maibong, Mahur, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹13 lakh and a site of 10.7 acres.
When was it filed?
The application was filed on 22 Jul 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 24 Jul 2026 |
| Application filed | 22 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Amun Daulagupu |
| Land area | 10.7 acres (4.4 ha) |
| Project cost | ₹13 lakh |
| Village / locality | Maibong |
| Taluk / tehsil | Mahur |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01641 |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.7 acres, this one is smaller than 59% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Maibong, Mahur, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diyung River Block 1 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 4.7 km away
- Diyung River Block 1 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 4.7 km away
- Diyung River Block 2 Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 7.4 km away
- Diyung River Block 2 Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 7.4 km away
- Assam/PSP04 — cleared for impact study, 8.1 km away
- Diyung River Block 3 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 9 km away
- Diyung River Block 3 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 9 km away
- Diyung River Stone Boulder Mining Permit Area — environmental approval granted, 10.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.