Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 11 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Myriad Developers |
| Use | Residential |
| Units | 168 |
| Floors (tallest) | 11 |
| Basements | 1 |
| Height | 33 m |
| Land area | 1.6 acres (0.6 ha) |
| Built-up area | 22,212 m² (2,39,088 sq ft) |
| Plot area | 6,408 m² (68,975 sq ft) |
| Project cost | ₹50.1 crore |
| Village / locality | Saru Sajai Nc |
| Taluk / tehsil | Dispur |
| District | Kamrup Metropolitan |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01710 |
In context
102 applications in Kamrup Metropolitan since January 2022 are in the same category (Buildings & townships): 75 approved, 17 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.6 acres, this one is smaller than 86% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saru Sajai Nc, Dispur, Kamrup Metropolitan, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Project at Village –Barsajai, Beltola, District Kamrup, Assam by… — environmental approval granted, 0 m away
- Residential Project at Village –Barsajai, Beltola, District Kamrup, Assam by… — under wildlife review, 0 m away
- Residential Project at Village –Barsajai, Beltola, District Kamrup, Assam by… — returned to applicant, 0 m away
- Proposed Residential Building "Golden Woods Utsav" by The Golden Woods… — environmental approval granted, 50 m away
- Road Connecting Koinadhara to the Existing Rani Koinadhora Road, Guwahati… — under forest review, 450 m away
- Expansion of Commercial cum Residential Project "Galaxy Mixed Use Development"… — environmental approval granted, 550 m away
- Expansion of Commercial cum Residential Project "Galaxy Mixed Use Development"… — returned to applicant, 550 m away
- Expansion of Commercial cum Residential Project "Galaxy Mixed Use Development"… — cleared for impact study, 550 m away
More from Myriad Developers in Kamrup Metropolitan
- Residential Project at Village –Barsajai, Beltola, District Kamrup, Assam by… — environmental approval granted
- Residential Project at Village –Barsajai, Beltola, District Kamrup, Assam by… — under wildlife review
- Residential Project at Village –Barsajai, Beltola, District Kamrup, Assam by… — returned to applicant
All 4 Myriad Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.