Quick answers
What is this project?
Narayanpur P.P. Land Sand, Gravel, Boulder & Ordinary Clay/Silt Mining Permit Area is a lapsed mining project in Koila Moila, Sidli (Pt), Chirang, Assam. The site covers 7.8 acres.
Who is building it?
The applicant is Ranjan Basumatary.
Has it been approved?
No. The application was lapsed on 20 Aug 2026, so it is no longer under consideration.
Where is it?
In Koila Moila, Sidli (Pt), Chirang, Assam.
How big is it?
It has a stated cost of ₹3 lakh and a site of 7.8 acres.
When was it filed?
The application was filed on 21 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Aug 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ranjan Basumatary |
| Land area | 7.8 acres (3.2 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Koila Moila |
| Taluk / tehsil | Sidli (Pt) |
| District | Chirang |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01735 |
In context
35 applications in Chirang since January 2022 are in the same category (Mining): 11 approved, 3 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.8 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Koila Moila, Sidli (Pt), Chirang, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Makra River Sand-Gravel and Stone Mahal at (Patalmari) Rajapara Area — lapsed, 1000 m away
- Instalation of BSNL Tower — more information requested, 1.9 km away
- Kanamakra River Bed Sand, Gravel and Stone Mahal at Kanamakra Rajapara Area — environmental approval granted, 3 km away
- Huthuti River Sand, Gravel & Boulder Mahal, South Gandabil — lapsed, 3.3 km away
- Huthuti River Sand, Gravel & Boulder Mahal, South Gandabil — environmental approval granted, 3.3 km away
- Govt. Permit Area of Langkar Sand, Gravel & Boulder River Mahal — lapsed, 4 km away
- Govt. Permit Area of Langkar Sand, Gravel & Boulder River Mahal — environmental approval granted, 4 km away
- Kanamakra Sand, Gravel & Boulder River Mahal No. 1 — lapsed, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.