Quick answers
What is MRL05-Road from Kalakhal to Kalakhal Khasia Punji?
MRL05-Road from Kalakhal to Kalakhal Khasia Punji is a lapsed road project in Bar>K Reserved Forest, Udarbond, Cachar, Assam. The site covers 3.5 acres.
Who is building it?
The applicant is Executive Engineer, Pwrd, Dholai & Sonai Territorial Road, Division.
Has it been approved?
No. The application was lapsed on 13 Dec 2025, so it is no longer under consideration.
Where is it?
In Bar>K Reserved Forest, Udarbond, Cachar, Assam.
How big is it?
It has a stated cost of ₹1.7 crore; a site of 3.5 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 9 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Dec 2025 |
| Application filed | 9 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, Pwrd, Dholai & Sonai Territorial Road, Division |
| Land area | 3.5 acres (1.4 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Bar>K Reserved Forest |
| Taluk / tehsil | Udarbond |
| District | Cachar |
| State | Assam |
| Location from | Site area on record |
| Our reference | WID-AS-01805 |
In context
11 applications in Cachar since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 8 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bar>K Reserved Forest, Udarbond, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Usof 4g Saturation Project — lapsed, 3.1 km away
- Construction of Road from Krishnapur Road to Bhuban Hill — lapsed, 3.7 km away
- Road From Krishnapur to Bhuban Hill Including Rcc Bridge Under Assam Darshan… — lapsed, 3.7 km away
- Road from Chandrapur to Darmikhal Riyang Punji — lapsed, 5.2 km away
- Proposed Sonai Irrigation Project ,Taluka Silchar, District Cacher, Assam by… — cleared for impact study, 5.8 km away
- Sonai Irrigation Project, Assam — more information requested, 6.9 km away
- Road from Chekarcham Point to Chekarcham FV via Methnathol Khasia Punji — lapsed, 8 km away
- Exploratory drilling for Forest Location TNAA by A&AA Basin ,ONGC — environmental approval granted, 10.9 km away
More from Executive Engineer, Pwrd, Dholai & Sonai Territorial Road, Division in Cachar
- Road from Chandrapur to Darmikhal Riyang Punji — lapsed
- Road from Chekarcham Point to Chekarcham FV via Methnathol Khasia Punji — lapsed
- Road from 4th KM Dwarbond Pratappur Road to Nagathal FV — lapsed
- Road from Jarailtala Khasia Punjee to Jarailtala FV — lapsed
- Construction of Road from Krishnapur Road to Bhuban Hill — lapsed
- Road from Rajnikhal to Suparikhal via Gurudayalpur (MRL07) — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.