Quick answers
What is this project?
North Taklai Sand Gravel Stone and Boulder Mahal at Malavita Rf is a lapsed mining project in Bengtol Reserved Forest, Srijangram, Chirang, Assam. The site covers 10.8 acres.
Who is building it?
The applicant is Cpc Environment Solution Private Limited.
Has it been approved?
No. The application was lapsed on 20 Jan 2025, so it is no longer under consideration.
Where is it?
In Bengtol Reserved Forest, Srijangram, Chirang, Assam.
How big is it?
It has a stated cost of ₹82 lakh; a site of 10.8 acres and 8.3 acres (3.4 ha) of forest land.
When was it filed?
The application was filed on 21 Aug 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Jan 2025 |
| Application filed | 21 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Cpc Environment Solution Private Limited |
| Land area | 10.8 acres (4.4 ha) |
| Forest land | 8.3 acres (3.4 ha) |
| Project cost | ₹82 lakh |
| Village / locality | Bengtol Reserved Forest |
| Taluk / tehsil | Srijangram |
| District | Chirang |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01835 |
In context
35 applications in Chirang since January 2022 are in the same category (Mining): 11 approved, 3 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.8 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bengtol Reserved Forest, Srijangram, Chirang, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- North Taklai Sand Gravel, Stone & Boulder Mahal at Malvita (Rf) — lapsed, 0 m away
- Extension of Chapaguri Amteka - Bhutan - Border road for providing… — lapsed, 1.9 km away
- Taklai River Mahal at Betini F.V — lapsed, 2.1 km away
- Taklai River Mahal at Betini F.V — lapsed, 2.1 km away
- Integrated Check Post at Hatisar — under forest review, 5 km away
- Integrated Check Post at Hatisar — lapsed, 5 km away
- Govt. Permit Area of Deosri Aie River — lapsed, 5 km away
- Govt. Permit Area of Deosri Aie River — environmental approval granted, 5 km away
All 22 Cpc Environment Solution projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.