Quick answers
What is Usof 4g Saturation Project?
Usof 4g Saturation Project is a lapsed project in Bar>K Reserved Forest, Udarbond, Cachar, Assam. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Bar>K Reserved Forest, Udarbond, Cachar, Assam.
How big is it?
It has a stated cost of ₹1.3 crore; a site of 0.1 acres and 200 m² of forest land.
When was it filed?
The application was filed on 16 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 16 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 600 m² |
| Forest land | 200 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Bar>K Reserved Forest |
| Taluk / tehsil | Udarbond |
| District | Cachar |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01928 |
In context
5 applications in Cachar since January 2022 are in the same category (Other): 1 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bar>K Reserved Forest, Udarbond, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4-laning of Vairengte - Chhimluang section (Package-3) of NH-306 from Existing… — in-principle approval, conditions pending, 1.4 km away
- Four-Laning of Silchar-Vairengte Section (Package-2, Design Chainage Km 20+000… — more information requested, 1.5 km away
- Rukni River Minor Mineral Unit Sand Mining Permit Area — environmental approval granted, 3 km away
- Rukni River Minor Mineral Unit-1 (Sand) (Channighat) — under environmental review, 3.2 km away
- Patta Land Ordinary Earth Mining Permit Area at Rajgobidapur Mouza — environmental approval granted, 4.5 km away
- Road from Rajnikhal to Suparikhal via Gurudayalpur (MRL07) — lapsed, 5.2 km away
- 3d Seismic Data Acquisition in Teidukhan, Cachar — forest land use approved, 7 km away
- River Minor Mineral Unit (Sand) (Saptagram) on Rukni River Bed — environmental approval granted, 9.8 km away
More from Mahesh Nair in Cachar
- Usof 4g Saturation Project — lapsed
- USO Funded 4G Saturation Project — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.