Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Aug 2024 |
| Application filed | 29 Apr 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Mining |
| Applicant | Pinky Rai |
| Land area | 4.8 acres (2 ha) |
| Forest land | 4.8 acres (2 ha) |
| Project cost | ₹20 crore |
| Village / locality | Dalang Reserved Forest |
| Taluk / tehsil | Golaghat |
| District | Golaghat |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01952 |
In context
85 applications in Golaghat since January 2022 are in the same category (Mining): 38 approved, 29 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.8 acres, this one is smaller than 52% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Dalang Reserved Forest, Golaghat, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Drilling for Oil and Gas in East Lakhibari Area by M/s ONGC - Environmental… — lapsed, 0 m away
- Change of Land use for development drilling of ELAA , ELDC, ELDD, ELDE, ELDF… — more information requested, 0 m away
- ONGC,Exploratory Drilling location ELAK ,area 1.784 ha — more information requested, 2 km away
- ONGC, Drilling of Exploratory Location ELAJ — more information requested, 3.6 km away
- ONGC,Exploratory Drilling location KPAH ,area 1.89 ha — under forest review, 4.7 km away
- Construction of Hindustan PetrolPump (HP) — lapsed, 4.7 km away
- Petrol Pump Construction — lapsed, 4.7 km away
- Diversion of Forest Land for Construction of Mobile Tower at 2no. Jamuguri,… — more information requested, 5.8 km away
More from Pinky Rai in Golaghat
- Environmental Clearance for well JP#01z, Golaghat District, Assam — environmental approval granted
- ROU for 4" pipeline from Khoraghat GGS-1 and Khoraghat GGS-2 — not approved
- Environmental Clearance for well JP#01z, Golaghat District, Assam — environmental approval granted
- Exploratory drilling of 30 wells in PEL/ML Blocks of South Assam Shelf Block… — not approved
- Change of Land Use for Drilling Development Wells Khei, Khej, Khek, Khel From… — more information requested
- Drilling for Oil and Gas in East Lakhibari Area by M/s ONGC - Environmental… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.