Quick answers
What is Additional Land for Duarmara facility?
Additional Land for Duarmara facility is a proposed project in Upper Dihing Reserved Forest, Margherita, Tinsukia, Assam. The site covers 2.5 acres.
Who is building it?
The applicant is Oilmax Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Upper Dihing Reserved Forest, Margherita, Tinsukia, Assam.
How big is it?
It has a stated cost of ₹1.8 crore; a site of 2.5 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 21 Oct 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 22 Oct 2025 |
| Application filed | 21 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Oilmax Energy Private Limited |
| Land area | 2.5 acres (1 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Upper Dihing Reserved Forest |
| Taluk / tehsil | Margherita |
| District | Tinsukia |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01994 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Oct 2025 (this page) | Initial checks | 2.5 acres | ₹1.8 crore |
| New project filed 19 Jun 2025 | Lapsed | 2.5 acres | ₹1.8 crore |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Upper Dihing Reserved Forest, Margherita, Tinsukia, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Additional Land for Duarmara facility — lapsed, 0 m away
- Diversion of Forest Land for Construction of Mobile Tower at Kherjan — more information requested, 2.4 km away
- Nazirating Raw Water Intake Plant of Iocl (Aod). — more information requested, 9.6 km away
- Capacity Augmentation of Digboi Refinery to 1 MMTPA — decision issued, 9.7 km away
- DIG/N Sand Mining Contract Area of 2022-29 — environmental approval granted, 10.1 km away
- Forest Diversion Proposal for oil & gas well Drilling at Loc. OWMA located in… — lapsed, 10.6 km away
- Diversion of Forest land (Sub-surface) for drilling exploratory ERD location… — under forest review, 10.9 km away
- DIG/O Sand Mining Contract Area of 2022-29 — environmental approval granted, 11.3 km away
All 18 Oilmax Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.