Project details
| Official title | Laying of Proposed Dimapur - Imphal Pipeline of 12" Dia Carbon steel Along with OFC Conduit in the District Golaghat District, Assam. |
|---|---|
| Status | Lapsed |
| Status since | 8 May 2024 |
| Application filed | 26 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indradhanush Gas Grid Limited |
| Land area | 648.7 acres (262.5 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹92.7 crore |
| Village / locality | Diphu Reserved Forest |
| Taluk / tehsil | Sarupathar |
| District | Golaghat |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-02034 |
In context
14 applications in Golaghat since January 2022 are in the same category (Pipelines): 1 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. At 648.7 acres, this one is larger than 83% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Diphu Reserved Forest, Sarupathar, Golaghat, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Diversion Proposal for construction of RT cum IP Station for Dergaon –… — lapsed, 2.2 km away
- Forest Diversion Proposal for construction of RT cum IP Station for Dergaon –… — more information requested, 2.6 km away
- Oil & Gas Exploration Drilling at Well Pad# 21 (FE-001) in AA-ONHP-2017/1… — lapsed, 20.6 km away
- Oil & Gas Exploration Drilling at Well Pad# 22 (FW-005) in AA-ONHP-2017/1… — lapsed, 21.4 km away
- Diversion of Forest Land for Construction of Mobile Tower at Nakhuti — under forest review, 21.4 km away
- ROU for 4" pipeline from Khoraghat GGS-1 and Khoraghat GGS-2 — not approved, 24.2 km away
- Forest Clearance for the location BWNA — forest land use approved, 24.4 km away
- ONGC, Exploratory Drilling Location CJAA — forest land use approved, 25.1 km away
More from Indradhanush Gas Grid Limited in Golaghat
- Diversion of forest land measuring 0.26 Ha for construction of KASAB and SUAB… — more information requested
- Diversion of forest land measuring 0.3777 Ha for construction of Khoraghat and… — more information requested
- Forest Diversion Proposal for construction of RT cum IP Station for Dergaon –… — more information requested
- Laying of proposed 5 numbers of Feeder Lines namely KSAB WHI FL, SUAB WHI FL,… — lapsed
- Laying of proposed 4 numbers of Feeder Lines namely KSAB WHI FL, SUAB WHI FL,… — more information requested
- Diversion of forest land measuring 0.4581 Ha for construction of SV Station… — more information requested
9 Indradhanush Gas Grid projects in Golaghat
All 39 Indradhanush Gas Grid projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.