| Status | Under environmental review |
|---|---|
| Status since | 24 Nov 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Raj Kumar Gupta |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹61 crore |
| Village / locality | Garalgaon |
| Taluk / tehsil | Azara |
| District | Kamrup Metropolitan |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-02154 |
What the filings say
What is planned
Rang Homes Phase-I is a residential group housing project that was completed on 25 June 2021. The applicant is seeking environmental clearance for the completed works, which were initially undertaken without such clearance. The project is situated on a plot area of 8,029.38 square metres (0.8 hectares) with a total built-up area of 23,926.02 square metres.
The development consists of 318 residential units. The building configuration includes a ground floor and eight upper floors. The applicant's conceptual plan indicates that the project was developed alongside a separate Phase-II, which received its own environmental clearance in July 2021.
Area Statement
| Floor | Built-up Area (sq. m.) |
|---|---|
| Ground Floor | 2,984.06 |
| First to Seventh Floor (each) | 2,822.40 |
| Eighth Floor | 1,185.16 |
| Total | 23,926.02 |
Layout and design
The project features an earthquake-resistant structure designed for the local seismicity. It includes an integrated security system, fire fighting systems as per NBC-2016, and dual plumbing. Parking provisions include 78 covered car spaces, 65 open car spaces, and 134 covered scooter parking spaces.
Land and surroundings
The site is located at Plot No. 2, Aerocity, Dharapur-Palashbari Road in Garalgaon. The land is identified under Dag numbers 901, 903, 898, and 911. The site is approximately 1.16 km from National Highway 17 and 3.31 km from Lokapriya Gopinath Bardoloi International Airport. The Brahmaputra River is located about 0.83 km to the northwest.
About 2,650 square metres (33% of the total area) has been developed as a greenbelt. Planted species include Pride of India, White Frangipani, Ashoka tree, and Jackfruit.
Water, power and access
Water requirements for the operational phase are met through groundwater, totaling 222 kilolitres per day (KLD). Wastewater generation is estimated at 178 KLD, which is treated in an on-site Sewage Treatment Plant (STP) with a capacity of 200 KLD.
Power is supplied by the Assam Power Distribution Company Limited. For backup, the project has two diesel generator sets with capacities of 125 KVA and 82.5 KVA, equipped with acoustic enclosures.
Environmental safeguards
Solid waste generation is estimated at 843 kg per day, consisting of 50% biodegradable waste, 40% non-biodegradable waste, and 10% recyclables. Biodegradable waste is processed in an organic waste converter, with 20% of the output used as manure. Recyclable materials like paper, plastic, and metals are sold to recyclers.
The storm water disposal system includes rainwater harvesting pits and seepage pits at regular intervals for groundwater recharging. All building roof water is directed through rain water pipes to these systems.
Rang Homes Phase-I site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
102 applications in Kamrup Metropolitan since January 2022 are in the same category (Buildings & townships): 75 approved, 17 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 75% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Garalgaon, Azara, Kamrup Metropolitan, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Revision and Expansion of Residential Apartment Buildings by M/s Kamakhya… — environmental approval granted, 200 m away
- ARANYA BY RANG HOMES-Phase-1 — environmental approval granted, 200 m away
- Building project by HOTEL HOLIDAY INN(A unit of YUVAAN DEVELOPERS PRIVATE… — environmental approval granted, 200 m away
- Expansion of Uttarayan Shreejoni - Residential Apartment & Commercial Building — under environmental review, 450 m away
- Expansion of Uttarayan Shreejoni - Residential Apartment & Commercial Building — under environmental review, 450 m away
- Uttarayan Shreejoni - Extension of Residential Apartment & Commercial Building — environmental approval granted, 450 m away
- Proposed Residential cum commercial Building "Centauri Dharapur" — environmental approval granted, 800 m away
- Proposed R.C.C (G+11)Residential Apartment Building at… — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.