Cleared for impact studyMining · Bhojpur, Bihar

Sand Mining Project of Area 18.00 Ha at Sand Block-08 Ghat on Son River of District-Bhojpur of State-Bihar

Sand Mining Project of Area 18.00 Ha at Sand Block-08 Ghat on Son River of District-Bhojpur of State-Bihar is a proposed mining project in Bishunpur, Koilwar, Bhojpur, Bihar. The site covers 44.5 acres. Its stated project cost is ₹18 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Nov 2022).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project of Area 18.00 Ha at Sand Block-08 Ghat on Son River of District-Bhojpur of State-Bihar is a proposed mining project in Bishunpur, Koilwar, Bhojpur, Bihar. The site covers 44.5 acres.

Who is building it?

The applicant is Kumar Abhishek.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 Nov 2022), as of 27 Nov 2026.

Where is it?

In Bishunpur, Koilwar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹18 crore and a site of 44.5 acres.

When was it filed?

The application was filed on 29 Nov 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project of Area 18.00 Ha at Sand Block-08 Ghat on Son River of…

Project details

StatusCleared for impact study
Status since29 Nov 2022
Application filed29 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKumar Abhishek
Land area44.5 acres (18 ha)
Project cost₹18 crore
Village / localityBishunpur
Taluk / tehsilKoilwar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00027

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Aug 2023Environmental approval granted44.5 acres₹18 crore
Early planning filed 29 Nov 2022 (this page)Cleared for impact study44.5 acres₹18 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 44.5 acres, this one is smaller than 80% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Bishunpur, Koilwar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.