Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Dec 2022 |
| Application filed | 1 Dec 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vinay Construction |
| Land area | 109.5 acres (44.3 ha) |
| Project cost | ₹22.2 crore |
| Village / locality | Jhinaura |
| Taluk / tehsil | Lakhisarai |
| District | Lakhisarai |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00047 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Aug 2023 | Environmental approval granted | 109.5 acres | ₹22.2 crore |
| Early planning filed 1 Dec 2022 (this page) | Cleared for impact study | 109.5 acres | ₹22.2 crore |
In context
38 applications in Lakhisarai since January 2022 are in the same category (Mining): 33 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 109.5 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Jhinaura, Lakhisarai, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project at Kiul River Cluster I (Block No.- 03 & 04) Lakhisarai… — environmental approval granted, 0 m away
- Sand Ghat Mining Project (Lakhisarai Block - 05) at Riverbed of Kiul River — environmental approval granted, 1.4 km away
- Sand Ghat Mining Project (Lakhisarai Block - 05) at Riverbed of Kiul River — cleared for impact study, 1.4 km away
- Sand Mining Project at Block No.- 06 Sand Ghat on River Kiul — environmental approval granted, 2.4 km away
- Sand Mining Project at Block No.- 06 Sand Ghat on River Kiul — cleared for impact study, 2.4 km away
- Sand Mining Project on Kiul River at Sand Block-02 — environmental approval granted, 2.9 km away
- Sand Mining Project on Kiul River at Sand Block-02 — cleared for impact study, 2.9 km away
- Sand Mining Project (Block No.- 07 Sand Ghat) — cleared for impact study, 3.8 km away
All 4 Vinay Construction projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.