Quick answers
What is this project?
Sand Mining Project on Sone River at Aurangabad Ghat 21, of District - Aurangabad, State-Bihar is a proposed mining project in Gothauli, Barun, Aurangabad, Bihar. The site covers 217.3 acres.
Who is building it?
The applicant is Babita Sinha.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Nov 2022), as of 27 Nov 2026.
Where is it?
In Gothauli, Barun, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹26.9 crore and a site of 217.3 acres.
When was it filed?
The application was filed on 29 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project on Sone River at Aurangabad Ghat 21, of District - Aurangabad,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Nov 2022 |
| Application filed | 29 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Babita Sinha |
| Land area | 217.3 acres (87.9 ha) |
| Project cost | ₹26.9 crore |
| Village / locality | Gothauli |
| Taluk / tehsil | Barun |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00049 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 May 2023 | Environmental approval granted | 217.3 acres | ₹26.9 crore |
| Early planning filed 29 Nov 2022 (this page) | Cleared for impact study | 217.3 acres | ₹26.9 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 217.3 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Gothauli, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project on Sone River at Aurangabad Ghat 21, of District -… — environmental approval granted, 0 m away
- Proposed Sand Mining Project Aurangabad Sone- 20 A on Sone River of District-… — environmental approval granted, 1.1 km away
- Proposed Sand Mining Project Aurangabad Sone- 20 A on Sone River of District-… — cleared for impact study, 1.1 km away
- Proposed Sand Mining Project Sand Block No.-19 C At Khata No.- 30, Khesra No.-… — under environmental review, 1.4 km away
- Proposed Sand Mining Project Aurangabad Sone- 22-A on Sone River of District-… — cleared for impact study, 1.7 km away
- Sand Mining Project at Sand Block No. - 19B located at Mouza - Bagahi, Block -… — environmental approval granted, 1.7 km away
- Sand Mining Project at Sand Block No. - 19B located at Mouza - Bagahi, Block -… — cleared for impact study, 1.7 km away
- Proposed Sand Mining Project Aurangabad Sone- 19-A on Sone River of District-… — cleared for impact study, 2 km away
More from Babita Sinha in Aurangabad
- Proposed Sand Mining Project of Area 94.88 Ha at Aurangabad Ghat 09 on Sone… — cleared for impact study
- Proposed Sand Mining Project of Area 94.88 Ha at Aurangabad Ghat 09 on Sone… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.