What is Developing? Open the mapMap

Cleared for impact studyMining · Aurangabad, Bihar

Sand Mining Project on Sone River at Aurangabad Ghat 21, of District - Aurangabad, State-Bihar.

Sand Mining Project on Sone River at Aurangabad Ghat 21, of District - Aurangabad, State-Bihar is a proposed mining project in Gothauli, Barun, Aurangabad, Bihar. The site covers 217.3 acres. Its stated project cost is ₹26.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Nov 2022).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project on Sone River at Aurangabad Ghat 21, of District - Aurangabad, State-Bihar is a proposed mining project in Gothauli, Barun, Aurangabad, Bihar. The site covers 217.3 acres.

Who is building it?

The applicant is Babita Sinha.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 Nov 2022), as of 27 Nov 2026.

Where is it?

In Gothauli, Barun, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹26.9 crore and a site of 217.3 acres.

When was it filed?

The application was filed on 29 Nov 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project on Sone River at Aurangabad Ghat 21, of District - Aurangabad,…

Project details

StatusCleared for impact study
Status since29 Nov 2022
Application filed29 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantBabita Sinha
Land area217.3 acres (87.9 ha)
Project cost₹26.9 crore
Village / localityGothauli
Taluk / tehsilBarun
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00049

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 May 2023Environmental approval granted217.3 acres₹26.9 crore
Early planning filed 29 Nov 2022 (this page)Cleared for impact study217.3 acres₹26.9 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 217.3 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.

Where it is

Gothauli, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Babita Sinha in Aurangabad

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.