What is Developing? Open the mapMap

Cleared for impact studyMining · Nawada, Bihar

Sand Mining Project of Area 13.0 Ha at Sand Block-17 Ghat on Khuri River of District-Nawada of State-Bihar

Sand Mining Project of Area 13.0 Ha at Sand Block-17 Ghat on Khuri River of District-Nawada of State-Bihar is a proposed mining project in Kurma, Nawada, Bihar. The site covers 32.1 acres. Its stated project cost is ₹1.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 26 Jun 2023).

See it on the live map All projects in Nawada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project of Area 13.0 Ha at Sand Block-17 Ghat on Khuri River of District-Nawada of State-Bihar is a proposed mining project in Kurma, Nawada, Bihar. The site covers 32.1 acres.

Who is building it?

The applicant is Snehal Roy.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 26 Jun 2023), as of 27 Nov 2026.

Where is it?

In Kurma, Nawada, Bihar.

How big is it?

It has a stated cost of ₹1.9 crore and a site of 32.1 acres.

When was it filed?

The application was filed on 26 Jun 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project of Area 13.0 Ha at Sand Block-17 Ghat on Khuri River of…

Project details

StatusCleared for impact study
Status since26 Jun 2023
Application filed26 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSnehal Roy
Land area32.1 acres (13 ha)
Project cost₹1.9 crore
Village / localityKurma
Taluk / tehsilNawada
DistrictNawada
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00091

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Nov 2023Environmental approval granted32.1 acres₹1.9 crore
Early planning filed 26 Jun 2023 (this page)Cleared for impact study32.1 acres₹1.9 crore

In context

104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 32.1 acres, this one is larger than 66% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Kurma, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Snehal Roy in Nawada

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.