Environmental approval grantedMining · Jamui, Bihar

Sand Ghat Mining Project (Ulai River Block No.- 09 Sand Ghat) at Riverbed of Ulai River

Sand Ghat Mining Project (Ulai River Block No.- 09 Sand Ghat) at Riverbed of Ulai River is an approved mining project in Katauna, Barhat, Jamui, Bihar. The site covers 22.7 acres. Its stated project cost is ₹2.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Sept 2023).

See it on the live map All projects in Jamui

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Ghat Mining Project (Ulai River Block No.- 09 Sand Ghat) at Riverbed of Ulai River is an approved mining project in Katauna, Barhat, Jamui, Bihar. The site covers 22.7 acres.

Who is building it?

The applicant is Satish Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 25 Sept 2023), as of 27 Nov 2026.

Where is it?

In Katauna, Barhat, Jamui, Bihar.

How big is it?

It has a stated cost of ₹2.4 crore and a site of 22.7 acres.

When was it filed?

The application was filed on 25 Sept 2023.

Project details

StatusEnvironmental approval granted
Status since25 Sept 2023
Application filed25 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSatish Kumar
Land area22.7 acres (9.2 ha)
Project cost₹2.4 crore
Village / localityKatauna
Taluk / tehsilBarhat
DistrictJamui
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00124

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Sept 2023 (this page)Environmental approval granted22.7 acres₹2.4 crore
Early planning filed 8 Feb 2023Cleared for impact study22.7 acres₹2.4 crore

In context

145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 22.7 acres, this one is smaller than 52% of them.

No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.

Where it is

Katauna, Barhat, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.