Quick answers
What is this project?
Sand Mining Project, Block- 22 (Paroriya) Sand Ghat of District- Nawada, State-Bihar is a proposed mining project in Paroria, Meskaur, Nawada, Bihar. The site covers 16.3 acres.
Who is building it?
The applicant is Maa Laxmi Creative Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Jan 2023), as of 27 Nov 2026.
Where is it?
In Paroria, Meskaur, Nawada, Bihar.
How big is it?
It has a stated cost of ₹4 crore and a site of 16.3 acres.
When was it filed?
The application was filed on 29 Jan 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Jan 2023 |
| Application filed | 29 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Maa Laxmi Creative Private Limited |
| Land area | 16.3 acres (6.6 ha) |
| Project cost | ₹4 crore |
| Village / locality | Paroria |
| Taluk / tehsil | Meskaur |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00125 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jan 2025 | Lapsed | 16.3 acres | ₹4 crore |
| Early planning filed 29 Jan 2023 (this page) | Cleared for impact study | 16.3 acres | ₹4 crore |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 16.3 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Paroria, Meskaur, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block- 22 (Paroriya) Sand Ghat of District- Nawada,… — lapsed, 0 m away
- Brick Earth Mining for M/S Lal Int Udyog Pvt Ltd- Rampur Soil Brick Mining… — environmental approval granted, 3.7 km away
- Sand Mining Project, Block- 21 (Sankh/Sanrh) Sand Ghat of District- Nawada,… — environmental approval granted, 3.9 km away
- Sand Mining Project, Block- 21 (Sankh/Sanrh) Sand Ghat of District- Nawada,… — cleared for impact study, 3.9 km away
- Sand Mining Project of Area 17.0 Ha at Sand Block-23 Ghat on Tillaiya River of… — environmental approval granted, 4.3 km away
- Sand Mining Project of Area 17.0 Ha at Sand Block-23 Ghat on Tillaiya River of… — cleared for impact study, 4.3 km away
- Brick Earth Mining for M/S Devi Int Udyog-Khanwan Soil Brick Mining Project — environmental approval granted, 4.5 km away
- Proposed Brick Earth Mining for M/S J P N Int Udyog - Rasalpura Soil Brick… — environmental approval granted, 4.5 km away
All 6 Maa Laxmi Creative projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.