Sand Mining Project, Block- 07 (Sultanpur/Bishunpur) Sand Ghat is a proposed mining project in Sultanpur, Warisaliganj, Nawada, Bihar. The site covers 135.9 acres.
Who is building it?
The applicant is Siyaram Construction.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 May 2023), as of 27 Nov 2026.
Where is it?
In Sultanpur, Warisaliganj, Nawada, Bihar.
How big is it?
It has a stated cost of ₹6 crore and a site of 135.9 acres.
When was it filed?
The application was filed on 30 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project, Block- 07 (Sultanpur/Bishunpur) Sand Ghat
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 May 2023 |
| Application filed | 30 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Siyaram Construction |
| Land area | 135.9 acres (55 ha) |
| Project cost | ₹6 crore |
| Village / locality | Sultanpur |
| Taluk / tehsil | Warisaliganj |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00274 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Sept 2023 | Environmental approval granted | 135.9 acres | ₹6 crore |
| Early planning filed 30 May 2023 (this page) | Cleared for impact study | 135.9 acres | ₹6 crore |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 135.9 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Sultanpur, Warisaliganj, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block- 07 (Sultanpur/Bishunpur) Sand Ghat — environmental approval granted, 0 m away
- Sand Mining Project, Block- 06 (Milky/Chilaungiya) Sand Ghat of District-… — environmental approval granted, 2.2 km away
- Sand Mining Project, Block- 06 (Milky/Chilaungiya) Sand Ghat of District-… — cleared for impact study, 2.2 km away
- Sand Mining Project, Block- 08 (Dariyapur) Sand Ghat of District- Nawada,… — environmental approval granted, 2.6 km away
- Sand Mining Project, Block- 08 (Dariyapur) Sand Ghat of District- Nawada,… — more information requested, 2.6 km away
- Proposed Brick Earth Mining for M/s PINKI INT UDYOG - Dariyapur Soil Brick… — environmental approval granted, 4 km away
- Proposed Warsaliganj Cement Grinding Unit with capacity of 2 x 3 MMTPA… — under environmental review, 5.3 km away
- Industrial Area, Warsaliganj — environmental approval granted, 5.3 km away
All 6 Siyaram Construction projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.