Project details
| Official title | Sand Mining Project of Unit-3 sand ghats of total Area 9.28 Ha at Bagmati River of District-Sheohar of State-Bihar |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Oct 2023 |
| Application filed | 7 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Baba Bhubaneswar Nath Construction Private Limited |
| Land area | 22.9 acres (9.3 ha) |
| Project cost | ₹4 crore |
| Village / locality | Kamrauli Dharampur Dekuli |
| Taluk / tehsil | Piprarhi |
| District | Sheohar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00351 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Oct 2023 (this page) | Environmental approval granted | 22.9 acres | ₹4 crore |
| Early planning filed 29 May 2023 | Cleared for impact study | 22.9 acres | ₹4 crore |
In context
30 applications in Sheohar since January 2022 are in the same category (Mining): 28 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 22.9 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Kamrauli Dharampur Dekuli, Piprarhi, Sheohar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project of Unit-3 sand ghats of total Area 9.28 Ha — cleared for impact study, 0 m away
- Brick Earth mining of M/s PUJA Int Udyog at Mauza- Mohari Tola Maula Ganj,… — environmental approval granted, 1 km away
- Sand Ghat Mining Project (Majhoura Ghat-Unit-2) at Riverbed of Bagmati River — environmental approval granted, 3.4 km away
- Sand Ghat Mining Project (Majhoura Ghat-Unit-2) at Riverbed of Bagmati River — cleared for impact study, 3.4 km away
- Brick Earth mining project of M/S Bajarang Int Udyog at Mauza-Kushahar,… — environmental approval granted, 3.9 km away
- Proposed Brick Earth mining project of M/s- Kumar Int Udyog at Mouja-… — environmental approval granted, 5.1 km away
- Brick Earth mining project of M/s- D.S.U Int Udyog at Mouja- Salempur, P.O-… — environmental approval granted, 5.3 km away
- Brick Earth mining of M/s AAJ Int Udyog at Mauza- Bashiya Ram, P.O.- Sheohar,… — environmental approval granted, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.