Quick answers
What is this project?
Sand Ghat Mining Project (Ulai River Block No. -07 Sand Ghat) at Ulai River bed is an approved mining project in Bukar, Jamui, Bihar. The site covers 32.9 acres.
Who is building it?
The applicant is Ajit Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Sept 2023), as of 27 Nov 2026.
Where is it?
In Bukar, Jamui, Bihar.
How big is it?
It has a stated cost of ₹4.6 crore and a site of 32.9 acres.
When was it filed?
The application was filed on 23 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Sept 2023 |
| Application filed | 23 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajit Singh |
| Land area | 32.9 acres (13.3 ha) |
| Project cost | ₹4.6 crore |
| Village / locality | Bukar |
| Taluk / tehsil | Jamui |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00359 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Sept 2023 (this page) | Environmental approval granted | 32.9 acres | ₹4.6 crore |
| Early planning filed 9 May 2023 | Cleared for impact study | 32.9 acres | ₹4.6 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 32.9 acres, this one is larger than 62% of them.
No other mining lease on record is within 500 m of this site; 21 have applied within 5 km.
Where it is
Bukar, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Ulai River Block No. -07 Sand Ghat) at Ulai River bed — cleared for impact study, 0 m away
- Proposed Brick Earth Mining Project of M/S M.R.P. INT UDYOG at Mauza - Sonpai,… — environmental approval granted, 650 m away
- JAMUI ULAI BLOCK 08 (SUGGI) SAND GHAT Mauja- Suggi, Anchal– Jamui, Dist- Jamui… — environmental approval granted, 850 m away
- Sand Ghat Mining Project (Ulai River Block No. -08 Sand Ghat) at Ulai River bed — environmental approval granted, 850 m away
- Sand Ghat Mining Project (Ulai River Block No. -08 Sand Ghat) at Ulai River bed — cleared for impact study, 850 m away
- Proposed Brick Earth Mining Project of M/S R.P.M. BRICKS at Mauza - Sonpe,… — environmental approval granted, 900 m away
- Sand Mining Project of Area 9.76 Ha at Sand Block-06 Ghat on Ulai River of… — environmental approval granted, 1.3 km away
- Sand Mining Project of Area 9.76 Ha at Sand Block-06 Ghat on Ulai River of… — cleared for impact study, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.