One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 28.70 Ha at Rohtas Sone Ghat 02 on Sone River of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Aarunya Construction & Supply Services Private Limited |
| Land area | 70.9 acres (28.7 ha) |
| Project cost | ₹22.8 crore |
| Village / locality | Atimi |
| Taluk / tehsil | Nasriganj |
| District | Rohtas |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00426 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 70.9 acres | ₹22.8 crore |
| New project filed 16 Aug 2023 | Environmental approval granted | 70.9 acres | ₹22.8 crore |
In context
78 applications in Rohtas since January 2022 are in the same category (Mining): 60 approved, 12 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 70.9 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Atimi, Nasriganj, Rohtas, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 28.70 Ha at Rohtas Sone Ghat 02 on Sone… — environmental approval granted, 0 m away
- Sand Mining Project of Area 18.88 Hectare at Rohtas Sone, Know, Thora Sand… — environmental approval granted, 1.9 km away
- Sand Mining Project of Area 18.88 Hectare at Rohtas Sone, Know, Thora Sand… — cleared for impact study, 1.9 km away
- Sand Mining Project on Sone River at Rohtas Sone 3A Sand Ghat of District -… — environmental approval granted, 3.5 km away
- Sand Mining Project on Sone River at Rohtas Sone 3A Sand Ghat of District -… — cleared for impact study, 3.5 km away
- Diversion of 0.0165 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 3.9 km away
- Toll Plaza in Sakkadi-Chandi-Sandesh-Bihata-Danwar-Nasriganj (SH-81) Road at… — initial checks, 4.3 km away
- Sand Mining Project, Rohtas Son Block- 3B Sand Ghat of District- Rohtas,… — environmental approval granted, 4.3 km away
All 6 Aarunya Construction & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.