Quick answers
What is this project?
Sand Ghat Mining Project (Chanan Block No. - 05) at Chanan River bed is a proposed mining project in Gobindpur, Banka, Bihar. The site covers 123.6 acres.
Who is building it?
The applicant is M/S Shree Ganesh Medical Agency.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Jul 2023), as of 27 Nov 2026.
Where is it?
In Gobindpur, Banka, Bihar.
How big is it?
It has a stated cost of ₹15.6 crore and a site of 123.6 acres.
When was it filed?
The application was filed on 27 Jul 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Jul 2023 |
| Application filed | 27 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Shree Ganesh Medical Agency |
| Land area | 123.6 acres (50 ha) |
| Project cost | ₹15.6 crore |
| Village / locality | Gobindpur |
| Taluk / tehsil | Banka |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00492 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Feb 2025 | Lapsed | 123.6 acres | ₹15.6 crore |
| New project filed 16 Jul 2024 | Returned to applicant | 123.6 acres | ₹15.6 crore |
| Early planning filed 27 Jul 2023 (this page) | Cleared for impact study | 123.6 acres | ₹15.6 crore |
In context
32 applications in Banka since January 2022 are in the same category (Mining): 24 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 123.6 acres, this one is larger than 78% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Gobindpur, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Chanan Block No. - 05) at Chanan River bed — lapsed, 0 m away
- Sand Ghat Mining Project (Chanan Block No. - 05) at Chanan River bed — returned to applicant, 0 m away
- Sand Ghat Mining Project (Chanan Block No. – 06) at Chanan River Bed — environmental approval granted, 2.1 km away
- Sand Ghat Mining Project (Chanan Block No. – 06) at Chanan River Bed — cleared for impact study, 2.1 km away
- Sand Ghat Mining Project (Chanan Block No. - 07) at Chanan River bed — environmental approval granted, 4.7 km away
- Sand Ghat Mining Project (Chanan Block No. - 07) at Chanan River bed — cleared for impact study, 4.7 km away
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — lapsed, 4.7 km away
- Proposed Sand Mining Project of Area 27 Ha at Chanan Block -03 on Chanan River… — environmental approval granted, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.