Quick answers
What is this project?
Sand Mining Project, Falgu River (Block No.- 14) Sand Ghat of District- Gaya, State-Bihar is an approved mining project in Gannu Bigha, Gaya Town C.D.Block, Gaya, Bihar. The site covers 30.9 acres.
Who is building it?
The applicant is Vinod Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Sept 2023), as of 27 Nov 2026.
Where is it?
In Gannu Bigha, Gaya Town C.D.Block, Gaya, Bihar.
How big is it?
It has a stated cost of ₹3.9 crore and a site of 30.9 acres.
When was it filed?
The application was filed on 12 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Sept 2023 |
| Application filed | 12 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vinod Kumar |
| Land area | 30.9 acres (12.5 ha) |
| Project cost | ₹3.9 crore |
| Village / locality | Gannu Bigha |
| Taluk / tehsil | Gaya Town C.D.Block |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00496 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Sept 2023 (this page) | Environmental approval granted | 30.9 acres | ₹3.9 crore |
| Early planning filed 5 May 2023 | Cleared for impact study | 30.9 acres | ₹3.9 crore |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30.9 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Gannu Bigha, Gaya Town C.D.Block, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Falgu River (Block No.- 14) Sand Ghat of District- Gaya,… — cleared for impact study, 0 m away
- Proposed Brick Earth Mining Project of M/s Star Int Udyog at Mauza -… — environmental approval granted, 1.5 km away
- Diversion of 0.01725 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 2.1 km away
- Brick Earth Mining project of M/s Jai Mata Di Bricks at Mauza- Rasalpur,… — environmental approval granted, 2.3 km away
- Proposed Residential Cum Commercial Building "RPS Gaya Ji City" at Gaya, Bihar. — environmental approval granted, 2.3 km away
- Brick Earth Mining for M/S Baba Bricks -Bhikhanpur Soil Brick Mining Project — environmental approval granted, 3.5 km away
- Brick Earth Mining for M/S S Y Bricks - Bhikanpur Soil Brick Mining Project — environmental approval granted, 3.8 km away
- Brick Earth Mining for M/S LP Bricks- Madanbigha Soil Brick Mining Project at… — environmental approval granted, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.