Project details
| Official title | Sand Mining Project at Unit no. - 02 (Maheshwara Sand Ghat) on Burhi Gandak river at District- Begusarai, Bihar |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Feb 2025 |
| Application filed | 15 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kundan Kumar |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹61 lakh |
| Village / locality | Haibatpur |
| Taluk / tehsil | Begusarai |
| District | Begusarai |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00518 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Dec 2024 (this page) | Environmental approval granted | 24.7 acres | ₹61 lakh |
| Early planning filed 31 Jul 2024 | Cleared for impact study | 24.7 acres | ₹61 lakh |
In context
119 applications in Begusarai since January 2022 are in the same category (Mining): 107 approved, 11 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 24.7 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Haibatpur, Begusarai, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project at Unit no. - 02 (Maheshwara Sand Ghat) on Burhi Gandak… — cleared for impact study, 0 m away
- Proposed Brick Earth Mining Project for M/s Bhagwati Int Udyog at Mauza + P.O… — environmental approval granted, 950 m away
- Diversion of 0.01425 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 2.5 km away
- Brick Earth Mining for M/S Om Bricks - Raghunathpur Karari Soil Brick Mining… — environmental approval granted, 2.6 km away
- Brick Earth Mining for M/S MAA JAI MANGLA BRICKS - Manjhaul Soil Brick Mining… — environmental approval granted, 2.6 km away
- Proposed Brick Earth Mining for M/S LOTUS BRICKS - Babhangama Soil Brick… — environmental approval granted, 2.8 km away
- Diversion of 0.0255 ha of forest land for construction of approach road for… — forest land use approved, 2.8 km away
- Sand Mining Project at Sand Block No. 03 Sand Ghat located at Mauza -… — environmental approval granted, 2.8 km away
More from Kundan Kumar in Begusarai
- Sand Mining Project on Ganga River of Unit no. – 11 of District – Begusarai of… — cleared for impact study
- Retail out-let dealership of M/s Hindustan Petroleum Corporation Ltd. Location… — forest land use approved
- Sand Mining Project at Unit No. - 01 (Sakrauli Chharapati, Sanjat, Pabra &… — environmental approval granted
- Sand Mining Project at Unit no. - 12 (Malhipur Sand Ghat) on Ganga river — environmental approval granted
- Sand Mining Project at Unit no. - 12 (Malhipur Sand Ghat) on Ganga river — cleared for impact study
- Sand Mining Project at Unit No. - 01 (Sakrauli Chharapati, Sanjat, Pabra &… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.