One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Ghat Mining Project Sakri 4 Sand Ghat (Sand Block No.- 04) on Sakri River District…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 May 2024 |
| Application filed | 26 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pintu Kumar |
| Land area | 16.6 acres (6.7 ha) |
| Project cost | ₹44 lakh |
| Village / locality | Dewaspura |
| Taluk / tehsil | Katrisarai |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00522 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Jul 2024 | Environmental approval granted | 16.6 acres | ₹44 lakh |
| Early planning filed 26 Apr 2024 (this page) | Cleared for impact study | 16.6 acres | ₹44 lakh |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 16.6 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.
Where it is
Dewaspura, Katrisarai, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project Sakri 4 Sand Ghat (Sand Block No.- 04) on Sakri River… — environmental approval granted, 0 m away
- Sand Mining Project, Nalanda Block- 04 Sand Ghat of District- Nalanda,… — withdrawn, 0 m away
- Brick Earth Mining for M/S New Suman Int Udyog- Ghosrawan Soil Brick Mining… — environmental approval granted, 1.7 km away
- Proposed Brick Earth Mining for M/S K P S Bricks - Durgapur Soil Brick Mining… — environmental approval granted, 2.1 km away
- Brick Earth Mining for M/S Narayan Bricks Company- Sonchari Soil Brick Mining… — environmental approval granted, 2.5 km away
- Diversion of 0.02 Ha of Forest Land for Construction of Approach Road for… — more information requested, 2.5 km away
- Diversion of 0.0135 ha of forest land for construction of approach road for… — more information requested, 3.5 km away
- Sand Mining Project, The Nalanda Sakari Balu Ghat no. - 03 — environmental approval granted, 3.6 km away
More from Pintu Kumar in Nalanda
- Proposed Brick Earth Mining for M/S Ganga Int Udyog - Kalia Soil Brick Mining… — environmental approval granted
- Sand Mining Project, Nalanda Block- 04 Sand Ghat of District- Nalanda,… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.