Project details
| Status | Withdrawn |
|---|---|
| Status since | 7 Jun 2025 |
| Application filed | 19 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Munna Kumar |
| Land area | 34.1 acres (13.8 ha) |
| Project cost | ₹48.5 crore |
| Village / locality | Arazi Barari Ramnagar |
| Taluk / tehsil | Mohanpur |
| District | Samastipur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00561 |
In context
59 applications in Samastipur since January 2022 are in the same category (Mining): 46 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 34.1 acres, this one is larger than 95% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Arazi Barari Ramnagar, Mohanpur, Samastipur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project of Sand Ghat "ganga-9e" of Area -13.8 Ha of Patna District — environmental approval granted, 0 m away
- Sand Mining Project of Sand Ghat "ganga-9e" of Area -13.8 Ha of Patna District — cleared for impact study, 0 m away
- Proposed Brick Earth Mining for M/S Baba Bricks- Matiaur Soil Brick Mining… — environmental approval granted, 10.9 km away
- M/S Shiv Bricks Proposed Brick Clay Mining Project at Mauza- Dhamaun, Block-… — environmental approval granted, 12.7 km away
- Proposed Brick Earth Mining Project for M/S Kundan Int Udyog at Mauza-… — environmental approval granted, 16.7 km away
- Diversion of 0.0105 Ha of Forest Land for Construction of Approach Road for… — lapsed, 17.9 km away
- Diversion of 0.01425 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 18.3 km away
- Brick Earth Mining for M/S India Bricks - Siram Dih Soil Brick Mining Project — environmental approval granted, 20.2 km away
More from Munna Kumar in Samastipur
- Sand Mining Project of Sand Ghat "ganga-9e" of Area -13.8 Ha of Patna District — environmental approval granted
- Sand Mining Project of Sand Ghat "ganga-9e" of Area -13.8 Ha of Patna District — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.