What is Developing? Open the mapMap

Cleared for impact studyMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 23.0 Ha at Bhojpur Sone- 32C on Sone River of District- Bhojpur State-Bihar

Proposed Sand Mining Project of Area 23.0 Ha at Bhojpur Sone- 32C on Sone River of District- Bhojpur State-Bihar is a proposed mining project in Karbasin, Sahar, Bhojpur, Bihar. The site covers 56.8 acres. Its stated project cost is ₹7.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Mar 2024).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 23.0 Ha at Bhojpur Sone- 32C on Sone River of District- Bhojpur State-Bihar is a proposed mining project in Karbasin, Sahar, Bhojpur, Bihar. The site covers 56.8 acres.

Who is building it?

The applicant is Maa Parvati Enterprises.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Mar 2024), as of 27 Nov 2026.

Where is it?

In Karbasin, Sahar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹7.1 crore and a site of 56.8 acres.

When was it filed?

The application was filed on 15 Mar 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 23.0 Ha at Bhojpur Sone- 32C on Sone River of…

Project details

StatusCleared for impact study
Status since21 Mar 2024
Application filed15 Mar 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMaa Parvati Enterprises
Land area56.8 acres (23 ha)
Project cost₹7.1 crore
Village / localityKarbasin
Taluk / tehsilSahar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00565

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Jul 2024Environmental approval granted₹7.1 crore
Early planning filed 15 Mar 2024 (this page)Cleared for impact study56.8 acres₹7.1 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 56.8 acres, this one is smaller than 76% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 113.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.

Where it is

Karbasin, Sahar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 8 Maa Parvati Enterprises projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.