Quick answers
What is this project?
Soil Mining Project for Brick Earth M/S Subh It Udyog of District-Bhojpur, Bihar is an approved mining project in Mainpura, Arrah, Bhojpur, Bihar. The site covers 6.8 acres.
Who is building it?
The applicant is Kamal Prakash Panday.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Aug 2024), as of 27 Nov 2026.
Where is it?
In Mainpura, Arrah, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹10 lakh and a site of 6.8 acres.
When was it filed?
The application was filed on 1 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Aug 2024 |
| Application filed | 1 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kamal Prakash Panday |
| Land area | 6.8 acres (2.7 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Mainpura |
| Taluk / tehsil | Arrah |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00601 |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 6.8 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Mainpura, Arrah, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail out-let dealership of M/s Hindustan Petroleum Corporation Ltd. Location… — forest land use approved, 3.2 km away
- Proposed Brick Earth Mining for M/S A.D.P BRICKS - Balua Soil Brick Mining… — environmental approval granted, 3.5 km away
- Proposed Brick Earth Mining for M/S BNP BRICKS - Nargada Soil Brick Mining… — environmental approval granted, 3.6 km away
- Diversion of 0.0195 Ha of Forest Land for Construction of Approach Road for… — more information requested, 4.5 km away
- Diversion of 0.0174 Ha of Forest Land for Construction of Approach Road for… — more information requested, 6 km away
- Diversion of 0.03225 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 6.5 km away
- Brick Earth Mining for M/S R. (Swastik) K. INT UDYOG - Gangahar Soil Brick… — environmental approval granted, 7.6 km away
- Retail out-let dealership of M/s NX100 PACIFIC BIOFUEL PVT Ltd. Location… — forest land use approved, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.