Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Aug 2024 |
| Application filed | 1 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bimal Kumar |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹3 crore |
| Village / locality | Ganghara |
| Taluk / tehsil | Dinapur-Cum-Khagaul |
| District | Patna |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00616 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Aug 2024 (this page) | Environmental approval granted | 19.8 acres | ₹3 crore |
| Early planning filed 27 May 2024 | Cleared for impact study | 19.8 acres | ₹3 crore |
In context
180 applications in Patna since January 2022 are in the same category (Mining): 161 approved, 18 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 19.8 acres, this one is larger than 56% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 56.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Ganghara, Dinapur-Cum-Khagaul, Patna, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Patna Ganga- 01-B on Ganga River of District-… — cleared for impact study, 0 m away
- Proposed Sand Mining Project Patna Ganga- 01-C on Ganga River of District-… — cleared for impact study, 500 m away
- Proposed Sand Mining Project Patna Ganga 01-A on River- Ganga of District-… — environmental approval granted, 650 m away
- Proposed Sand Mining Project Patna Ganga 01-A on River- Ganga of District-… — cleared for impact study, 650 m away
- Proposed Sand Mining Project of Area 16.0 Ha at Patna Ganga- 01-H on Ganga… — environmental approval granted, 2 km away
- Proposed Sand Mining Project of Area 16.0 Ha at Patna Ganga- 01-H on Ganga… — cleared for impact study, 2 km away
- Proposed Brick Earth Mining Project for M/s Golu Bricks Manufacturing Works at… — environmental approval granted, 3.8 km away
- M/s. Rajan Bricks, Shahpur Soil Mining — environmental approval granted, 3.9 km away
More from Bimal Kumar in Patna
- Proposed Sand Mining Project Patna Ganga 01-A on River- Ganga of District-… — environmental approval granted
- Proposed Sand Mining Project Patna Ganga 01-A on River- Ganga of District-… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.