Quick answers
What is this project?
Sand Mining Project of Area 26.0 Ha at Cheer Unit-I ( Sand Block 1 & 2) on Cheer River of District-Banka of State-Bihar is an approved mining project in Gadiaun, Dhuraiya, Banka, Bihar. The site covers 64.2 acres.
Who is building it?
The applicant is Raghav Chandak.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Aug 2024), as of 27 Nov 2026.
Where is it?
In Gadiaun, Dhuraiya, Banka, Bihar.
How big is it?
It has a stated cost of ₹3.6 crore and a site of 64.2 acres.
When was it filed?
The application was filed on 27 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Aug 2024 |
| Application filed | 27 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghav Chandak |
| Land area | 64.2 acres (26 ha) |
| Project cost | ₹3.6 crore |
| Village / locality | Gadiaun |
| Taluk / tehsil | Dhuraiya |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00630 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jul 2024 (this page) | Environmental approval granted | 64.2 acres | ₹3.6 crore |
| Early planning filed 8 May 2023 | Cleared for impact study | 64.2 acres | ₹3.6 crore |
In context
32 applications in Banka since January 2022 are in the same category (Mining): 24 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 64.2 acres, this one is smaller than 69% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gadiaun, Dhuraiya, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project of Area 26.0 Ha at Cheer Unit-I ( Sand Block 1 & 2) on… — cleared for impact study, 0 m away
- Proposed B-Site retail outlet dealership of M/S IOCL location: between 6 to 8… — forest land use approved, 3.5 km away
- Forest Clearance for Construction of(l+1) x2= 4 lane Staggered Toll Plaza at… — under forest review, 5.6 km away
- Diversion of 0.014625 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 9.8 km away
- Sand Mining Project of Area 67.0 Ha at Cheer Unit-II ( Sand Block 3,4 & 5) on… — under environmental review, 11.3 km away
- Sand Mining Project of Area 67.0 Ha at Cheer Unit-II ( Sand Block 3,4 & 5) on… — cleared for impact study, 11.3 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Between… — lapsed, 11.6 km away
- Retail out let dealership of M/s Baba Kusheshwar Nath Fuel Centre Location In… — forest land use approved, 11.6 km away
More from Raghav Chandak in Banka
- Sand Mining Project, Badua Unit No 2 Sand Ghat of District- Banka, State-Bihar — environmental approval granted
- Sand Mining Project, Badua Unit No 2 Sand Ghat of District- Banka, State-Bihar — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.