What is Developing? Open the mapMap

Environmental approval grantedMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 32.0 Ha at Bhojpur Sone- 43A on Sone River

Proposed Sand Mining Project of Area 32.0 Ha at Bhojpur Sone- 43A on Sone River is an approved mining project in Bihta, Tarari, Bhojpur, Bihar. The site covers 79.1 acres. Its stated project cost is ₹9.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Aug 2024).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 32.0 Ha at Bhojpur Sone- 43A on Sone River is an approved mining project in Bihta, Tarari, Bhojpur, Bihar. The site covers 79.1 acres.

Who is building it?

The applicant is Gladiata Engineering Makers Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Aug 2024), as of 27 Nov 2026.

Where is it?

In Bihta, Tarari, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹9.8 crore and a site of 79.1 acres.

When was it filed?

The application was filed on 8 Jul 2024.

Project details

StatusEnvironmental approval granted
Status since10 Aug 2024
Application filed8 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantGladiata Engineering Makers Private Limited
Land area79.1 acres (32 ha)
Project cost₹9.8 crore
Village / localityBihta
Taluk / tehsilTarari
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00714

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Jul 2024 (this page)Environmental approval granted79.1 acres₹9.8 crore
Early planning filed 12 Mar 2024Cleared for impact study79.1 acres₹9.8 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 79.1 acres, this one is larger than 52% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 153.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Bihta, Tarari, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 6 Gladiata Engineering Makers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.