Quick answers
What is this project?
Brick Earth Mining project of M/S MPS Int Udyog at Mauza- Kenuhat, Block- Laxmipur, District- Jamui, Bihar is an approved mining project in Kenuhat, Lakshmipur, Jamui, Bihar. The site covers 3.5 acres.
Who is building it?
The applicant is Mahesh Prasad Sah.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kenuhat, Lakshmipur, Jamui, Bihar.
How big is it?
It has a stated cost of ₹9 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 10 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Feb 2026 |
| Application filed | 10 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahesh Prasad Sah |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Kenuhat |
| Taluk / tehsil | Lakshmipur |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00832 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3.5 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kenuhat, Lakshmipur, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick clay mining project of M/s Bambam Int Udyog at Mauza- Matia,… — environmental approval granted, 3.5 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 6 km away
- Grid Connectivity to Vilages of Barhat and Laxmipur Block of Jamui District — under wildlife review, 7.4 km away
- Sand Mining Project of Area 05.0 Ha at Sand Block-01 Ghat on Bajan River of… — environmental approval granted, 7.9 km away
- Sand Mining Project of Area 05.0 Ha at Sand Block-01 Ghat on Bajan River of… — cleared for impact study, 7.9 km away
- Optical Fiber Cable Laying Work of 17.3 Km Between Laxmipur to Chormara… — decision issued, 8.3 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — under wildlife review, 8.3 km away
- Proposed Brick Earth Mining for M/S J.K.K BRICKS - Sukhlewa Soil Brick Mining… — environmental approval granted, 9.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.