Quick answers
What is this project?
Sand Mining Project, Patna Ganga 03-C Sand Ghat (Area 8.0 ha) is a withdrawn mining project in Mainpur Digha Taufir, Sonepur, Saran, Bihar. The site covers 19.8 acres.
Who is building it?
The applicant is Ram Sundar Singh.
Has it been approved?
No. The application was withdrawn on 1 Sept 2025, so it is no longer under consideration.
Where is it?
In Mainpur Digha Taufir, Sonepur, Saran, Bihar.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 1 Sept 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project, Patna Ganga 03-C Sand Ghat (Area 8.0 ha)
Project details
| Status | Withdrawn |
|---|---|
| Status since | 1 Sept 2025 |
| Application filed | 1 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram Sundar Singh |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Mainpur Digha Taufir |
| Taluk / tehsil | Sonepur |
| District | Saran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00898 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Sept 2025 | Environmental approval granted | 19.8 acres | ₹1.3 crore |
| New project filed 1 Sept 2025 (this page) | Withdrawn | 19.8 acres | ₹1.3 crore |
| Early planning filed 6 Dec 2024 | Cleared for impact study | 19.8 acres | ₹1.3 crore |
In context
42 applications in Saran since January 2022 are in the same category (Mining): 36 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 19.8 acres, this one is larger than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 66.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Mainpur Digha Taufir, Sonepur, Saran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Patna Ganga 03-C Sand Ghat (Area 8.0 ha) — environmental approval granted, 0 m away
- Sand Mining Project, Patna Ganga 03-C Sand Ghat (Area 8.0 ha) — cleared for impact study, 0 m away
- Patna Ganga Sand Ghat 03-B Sand Ghat at Riverbed of Ganga River — cleared for impact study, 200 m away
- Patna Ganga Sand Ghat 03-A Sand Ghat at Riverbed of Ganga River — cleared for impact study, 400 m away
- Patna Ganga Sand 2-E Sand Ghat at Riverbed of Ganga River — cleared for impact study, 550 m away
- Patna Ganga Sand Ghat 2-D Sand Ghat at Riverbed of Ganga River — cleared for impact study, 750 m away
- Brick Earth mining project of M/S Kiya Bricks — environmental approval granted, 4.5 km away
- Proposed Brick Earth Mining Project for M/S Renu Bricks — environmental approval granted, 4.6 km away