Quick answers
What is this project?
This approved mining project by M/S LAXMI BRICKS,Address – Mohammadpur Para P.O-Durgapur , P.S-Kadwa ,Anchal-Kadwa District- Katihar(Bihar) having Area -4.00 Acres or 1.618 Ha is in Mohammadpur Bangar, Kadwa, Katihar, Bihar. The site covers 4 acres.
Who is building it?
The applicant is Virendra Kumar Mehta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2025), as of 27 Nov 2026.
Where is it?
In Mohammadpur Bangar, Kadwa, Katihar, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 4 acres.
When was it filed?
The application was filed on 8 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2025 |
| Application filed | 8 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Virendra Kumar Mehta |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Mohammadpur Bangar |
| Taluk / tehsil | Kadwa |
| District | Katihar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00931 |
In context
72 applications in Katihar since January 2022 are in the same category (Mining): 49 approved, 16 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 4 acres, this one is smaller than 61% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mohammadpur Bangar, Kadwa, Katihar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S MAHADEV BRICKS ,Address – Arangi P.O-Chandpur ,… — environmental approval granted, 5.1 km away
- Diversion of 0.02715 Ha of Forest Land for Construction of Approach Road for… — lapsed, 6 km away
- Mining project by M/S PRASADI BRICKS, Mouza – Para P.O-Kalsar , P.S-Hasanganj… — environmental approval granted, 8.2 km away
- Diversion of 0.02175 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 9.9 km away
- Brick Earth Mining for M/S B B Bricks – Belwa Soil Brick Mining Project at… — initial checks, 10.5 km away
- Proposed Brick clay mining project at Mauja- Tetliya, Block- Kadwa, District-… — environmental approval granted, 11.2 km away
- Jhaua Soil Mining Project — lapsed, 11.2 km away
- Jhaua Soil Mining Project (Area: 4.05 Ha) — lapsed, 11.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.