Quick answers
What is this project?
Proposed Brick Earth Mining for M/S Maa Devi Int Udyog- Khanwan Soil Brick Mining Project is an approved mining project in Khanawan, Narhat, Nawada, Bihar. The site covers 4.2 acres.
Who is building it?
The applicant is Pravin Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Khanawan, Narhat, Nawada, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 4.2 acres.
When was it filed?
The application was filed on 5 Dec 2025.
Project details
| Official title | Proposed Brick Earth Mining for M/S Maa Devi Int Udyog- Khanwan Soil Brick Mining Project at Village- Khanwan, P.S- Narhat, District- Nawada (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Apr 2026 |
| Application filed | 5 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pravin Kumar |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Khanawan |
| Taluk / tehsil | Narhat |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00965 |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 4.2 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Khanawan, Narhat, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Hero Int Udyog-Taran Soil Brick Mining Project — environmental approval granted, 1.1 km away
- Brick Earth Mining for M/S Devi Int Udyog-Khanwan Soil Brick Mining Project — environmental approval granted, 1.1 km away
- Sand Mining Project on Dhanarjay River at Sand Block-29 (Daulatpur Ghat) of… — environmental approval granted, 1.4 km away
- Sand Mining Project on Dhanarjay River at Sand Block-29 (Daulatpur Ghat) of… — cleared for impact study, 1.4 km away
- Brick Earth Mining for M/S Mata Int Udyog- Khanwa Soil Brick Mining Project at… — environmental approval granted, 1.9 km away
- Brick Earth Mining for M/S Lal Int Udyog Pvt Ltd- Rampur Soil Brick Mining… — environmental approval granted, 2.9 km away
- Sand Mining Project of Area 17.0 Ha at Sand Block-23 Ghat on Tillaiya River of… — environmental approval granted, 5.3 km away
- Sand Mining Project of Area 17.0 Ha at Sand Block-23 Ghat on Tillaiya River of… — cleared for impact study, 5.3 km away
More from Pravin Kumar in Nawada
- Brick Earth Mining for M/S Devi Int Udyog-Khanwan Soil Brick Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.