Quick answers
What is this project?
Proposed Brick Earth Mining Project for M/s Shivam Int Udyog at Mauza- Barma, P.O- B.T Bigha, P.S + Block- Sherghati, District- Gaya, State- Bihar is an approved mining project in Barawan P. O., Sherghati, Gaya, Bihar. The site covers 3.5 acres.
Who is building it?
The applicant is Basant PRASAD SINGH.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Apr 2026), as of 27 Nov 2026.
Where is it?
In Barawan P. O., Sherghati, Gaya, Bihar.
How big is it?
It has a stated cost of ₹36 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 23 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Apr 2026 |
| Application filed | 23 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Basant PRASAD SINGH |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹36 lakh |
| Village / locality | Barawan P. O. |
| Taluk / tehsil | Sherghati |
| District | Gaya |
| State | Bihar |
| Location from | Site area on record |
| Our reference | WID-BR-00974 |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.5 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Barawan P. O., Sherghati, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block 31 (Gaya Morhar 18) Sand Ghat of District- Gaya,… — environmental approval granted, 1.4 km away
- Sand Mining Project, Block 31 (Gaya Morhar 18) Sand Ghat of District- Gaya,… — cleared for impact study, 1.4 km away
- Sand Mining Project, Block 32 (Gaya Morhar 19) Sand Ghat of District- Gaya,… — environmental approval granted, 2.9 km away
- Sand Mining Project, Block 32 (Gaya Morhar 19) Sand Ghat of District- Gaya,… — cleared for impact study, 2.9 km away
- Block 29 (Gaya Morhar 16) Sand Ghat of District- Gaya, State-Bihar — environmental approval granted, 3.4 km away
- Block 29 (Gaya Morhar 16) Sand Ghat of District- Gaya, State-Bihar — cleared for impact study, 3.4 km away
- Diversion of 0.05175 Ha of Forest Land for Construction of the Approach/Access… — more information requested, 3.6 km away
- Proposed Sand Mining Project of Area 6.0 Ha at Block-33 (Gaya Morhar-20) Sand… — cleared for impact study, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.