Quick answers
What is this project?
Proposed Ordinary Soil Mining project of M/s Raj Kumar Singh Raja Construction Pvt. Ltd located at Mauza – Ashni, PS & Anchal: Udwantnagar, District – Bhojpur, Bihar, over an area of 3.1323 Ha. Having a production capacity of 50,153 Cum is an approved mining project in Asni, Udwant Nagar, Bhojpur, Bihar. The site covers 7.7 acres.
Who is building it?
The applicant is Raj Kumar Singh Raja Construction Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Apr 2025), as of 27 Nov 2026.
Where is it?
In Asni, Udwant Nagar, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹61 lakh and a site of 7.7 acres.
When was it filed?
The application was filed on 17 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Apr 2025 |
| Application filed | 17 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raj Kumar Singh Raja Construction Private Limited |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹61 lakh |
| Village / locality | Asni |
| Taluk / tehsil | Udwant Nagar |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01016 |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 7.7 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Asni, Udwant Nagar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Improvement to Four Lane From Zero Mile to Asani Flyover(Left Out… — lapsed, 2.2 km away
- Proposed Brick Earth Mining for M/S Shubham Int Udyog - Kauna Soil Brick… — environmental approval granted, 2.4 km away
- Widening and Improvement to Four Lane From Zero Mile to Patar(Left Out of… — more information requested, 4 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — lapsed, 4.1 km away
- Widening & Improvement to Four Lane From Bampali to Girija More , Two Lane… — more information requested, 4.8 km away
- Widening & Improvement to Four Lane From Bampali to Girija More , Two Lane… — lapsed, 4.8 km away
- AGRICULTURAL ENGINEERING COLLEGE (Project of Bihar Agriculture University,… — environmental approval granted, 5.6 km away
- Brick Earth Mining for M/S R. (Swastik) K. INT UDYOG - Gangahar Soil Brick… — environmental approval granted, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.