Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Krishna |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Aamarpur |
| Taluk / tehsil | Rahui |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01072 |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 5.6 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Aamarpur, Rahui, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Alka Int Udyog- Itasang Soil Brick Mining Project — environmental approval granted, 3.8 km away
- Brick Earth Mining for M/S Loha Bricks- Barandi Soil Brick Mining Project — environmental approval granted, 6 km away
- Brick Earth Mining for M/S Usha Int Udyog-Andi Soil Brick Mining Project — environmental approval granted, 6.1 km away
- Brick Earth Mining for M/S Purnima Bricks-Kornawan Soil Brick Mining Project — environmental approval granted, 6.4 km away
- Proposed Brick Earth Mining for M/S M J D Int Udyog - Peshaur Soil Brick… — environmental approval granted, 6.5 km away
- Brick Earth Mining for M/S Tulsi Int Udyog- Lodipur Porajit Soil Brick Mining… — environmental approval granted, 7.2 km away
- Widening and Strengthening of Bihar Bakhtiyarpur (from Kargil Chowk to Pachasa… — in-principle approval, conditions pending, 7.3 km away
- Telecom project by Bharti Airtel Limited — lapsed, 7.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.