One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project of 175 KLPD grain based distillery by M/s Greenathol Ebiz Private…
Project details
| Official title | Greenfield Project of 175 KLPD grain based distillery along with 4.5 MW Cogeneration Power Plant at Mauza : Maranchi, Gochhari, Block Gogri, Dist. Khagaria, Bihar by M/s Greenathol Ebiz Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Oct 2025 |
| Application filed | 28 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Greenathol Ebiz Private Limited |
| Land area | 20.8 acres (8.4 ha) |
| Project cost | ₹175 crore |
| Village / locality | Marachi |
| Taluk / tehsil | Gogri |
| District | Khagaria |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01248 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Mar 2026 | Environmental approval granted | 20.8 acres | ₹175 crore |
| Early planning filed 28 Jul 2025 (this page) | Cleared for impact study | 20.8 acres | ₹175 crore |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marachi, Gogri, Khagaria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of 175 KLPD grain based distillery by M/s Greenathol Ebiz… — environmental approval granted, 0 m away
- Proposed Brick Earth Mining for M/S NATH BRICKS CO - Gauchhari Soil Brick… — environmental approval granted, 3.2 km away
- Proposed Brick Earth Mining for M/S MADHAV BRICKS - Chandwa Soil Brick Mining… — initial checks, 3.2 km away
- Proposed Brick Earth Mining for M/S Fine Int Udyog - Pasraha Soil Brick Mining… — environmental approval granted, 3.3 km away
- Proposed Brick Earth Mining for M/S D.P.Y Bricks- Kolsaara Soil Brick Mining… — environmental approval granted, 4.8 km away
- Brick Earth Mining for M/S Sri Chaurasia Bricks - Jamalpur Soil Brick Mining… — environmental approval granted, 5.1 km away
- Brick Earth Mining for M/S Bihar Int Udyog - Chandwa Soil Brick Mining Project… — environmental approval granted, 5.5 km away
- Proposed Soil Mining Project for M/S Chintesh Kumar - Chandwa Soil Mining… — environmental approval granted, 6.2 km away
About this information