Quick answers
What is this project?
Proposed Brick Earth Mining Project of M/s Vijeta Int Udyog at Mauza - Kumar, Block - Sikandra, District - Jamui, Bihar (Area - 1.34 ha.) is an approved mining project in Kumar G.P., Sikandra, Jamui, Bihar. The site covers 3.3 acres.
Who is building it?
The applicant is Shambhu Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Jun 2025), as of 27 Nov 2026.
Where is it?
In Kumar G.P., Sikandra, Jamui, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 3.3 acres.
When was it filed?
The application was filed on 18 May 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jun 2025 |
| Application filed | 18 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shambhu Kumar |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Kumar G.P. |
| Taluk / tehsil | Sikandra |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01366 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3.3 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kumar G.P., Sikandra, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth mining project of M/s- Nasib Int Udyog at Mouja- Kumar, PO- Kumar,… — environmental approval granted, 500 m away
- Brick Earth Mining project of M/s Vishwas Int Udyog at Mauza- Kumar, Block-… — initial checks, 800 m away
- Proposed Brick Earth Mining Project of M/s Aman Int Udyog at Mauza - Ramdih,… — environmental approval granted, 2.5 km away
- Proposed Brick Earth Mining Project of M/s Shivam Int Nirman Udyog at Mauza -… — environmental approval granted, 3 km away
- Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for… — more information requested, 4.3 km away
- Proposed Brick Earth Mining Project of M/s J.P.M. INT UDYOG at Mauza - Rawai,… — environmental approval granted, 4.7 km away
- Proposed Brick Earth Mining Project for M/s S.T Bricks at Mauza + P.O- Kaiyar,… — environmental approval granted, 6.2 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Within 8… — in-principle approval, conditions pending, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.