Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jun 2025 |
| Application filed | 22 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Eklavya Hsg Dky Jv |
| Land area | 16.1 acres (6.5 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Etwarpur Nizamat |
| Taluk / tehsil | Lalganj |
| District | Vaishali |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01380 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 May 2025 (this page) | Environmental approval granted | 16.1 acres | ₹1.7 crore |
| Early planning filed 29 Dec 2024 | Cleared for impact study | 16.1 acres | ₹1.7 crore |
| Early planning filed 11 Dec 2024 | Withdrawn | 16.1 acres | ₹9.9 crore |
In context
110 applications in Vaishali since January 2022 are in the same category (Mining): 63 approved, 43 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 16.1 acres, this one is larger than 84% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 39.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Etwarpur Nizamat, Lalganj, Vaishali, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 1A Sand Ghat — cleared for impact study, 0 m away
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 1A Sand Ghat — withdrawn, 0 m away
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 1B Sand Ghat — environmental approval granted, 250 m away
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 1B Sand Ghat — cleared for impact study, 250 m away
- 4 Lane Bakarpur-manikpur Section, Starting From Design Km 0.000 at Sitalpur… — environmental approval granted, 1.9 km away
- 4 Lane Bakarpur-manikpur Section, Starting From Design Km 0.000 at Sitalpur… — cleared for impact study, 1.9 km away
- Diversion of 0.00825 Ha of Forest Land for Construction of Approach Road for… — more information requested, 4.6 km away
- Diversion of 0.00975 Ha of Forest Land for Construction of Approach Road for… — more information requested, 6.9 km away
More from Eklavya Hsg Dky Jv in Vaishali
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 1B Sand Ghat — environmental approval granted
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 1B Sand Ghat — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.