Project details
| Official title | Brick Earth Mining for M/S Kanak Int Udyog-Jiar Soil Brick Mining Project at in Village + P.O - Jiar , P.S - Asthawan, District- Nalanda (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Dec 2025 |
| Application filed | 9 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shashi Kumar |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹7.1 crore |
| Village / locality | Jiar G.P. |
| Taluk / tehsil | Asthawan |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01428 |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 7.2 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.
Where it is
Jiar G.P., Asthawan, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/s S K R Int Udyog - Jiar Soil Brick Mining Project — environmental approval granted, 700 m away
- Brick Earth Mining for M/S Kumar Int Udyog - Mazidpur Soil Brick Mining Project — environmental approval granted, 1.2 km away
- Brick Earth Mining for M/S S K G Int Udyog-Devkali Soil Brick Mining Project — environmental approval granted, 1.6 km away
- Brick Earth Mining for M/S M D S Int Udyog - Mazidpur Soil Brick Mining Project — environmental approval granted, 1.7 km away
- Proposed Brick Earth Mining for M/S HOME EIT UDYOG – DEOKALI Soil Brick Mining… — environmental approval granted, 1.7 km away
- Brick Earth Mining for M/S Manoj Int Udyog-Bhojpur Soil Brick Mining Project — environmental approval granted, 1.8 km away
- Sand Mining Project, Nalanda Cluster- 01 Sand Ghat Mauja - Kulti & Tiuri,… — cleared for impact study, 1.8 km away
- Proposed Brick Earth Mining for M/S HANUMAN INT UDYOG - Malawan Soil Brick… — environmental approval granted, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.