Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prince Kumar Singh |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹32 lakh |
| Village / locality | Mohanpur Bharula |
| Taluk / tehsil | Ramgarh |
| District | Kaimur (Bhabua) |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01462 |
In context
29 applications in Kaimur (Bhabua) since January 2022 are in the same category (Mining): 21 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 3.3 acres, this one is smaller than 79% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Mohanpur Bharula, Ramgarh, Kaimur (Bhabua), Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project for M/S Sona Int Udyog — environmental approval granted, 3.6 km away
- 979.76 Acres Chart Land in Diversion of forest land ( 83.80 acres Jamaniya… — more information requested, 3.7 km away
- Diversion of 0.039 ha of forest land for construction of approach road for… — more information requested, 5.8 km away
- Proposed Brick Earth Mining for M/S GALAXY BRICKS - Bisrampur Soil Brick… — environmental approval granted, 7 km away
- Diversion of 0.0375 Ha of Forest Land for Construction of Approach Road for… — lapsed, 7.2 km away
- Proposed Brick Earth Mining Project for M/S Bir Int Udyog at Mauza- Narhan,… — environmental approval granted, 7.7 km away
- Retail out-let dealership of M/s Reliance BP Mobility Ltd. Location Between… — more information requested, 8.6 km away
- Proposed Brick Earth Mining Project for M/S S.K.S EET Udhyog at Mauza-… — environmental approval granted, 8.8 km away
More from Prince Kumar Singh in Kaimur (Bhabua)
- Proposed Brick Earth Mining Project for M/S Sona Int Udyog — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.